Quote:They look odd.
 

They look okay.  They can't expand the concrete to make them fit perfectly. 
Quote:They look okay.  They can't expand the concrete to make them fit perfectly. 
 

I think it looks awkward. But I am sure they will figure a way to make it look more aethstetic.
Looks like video now..

Closing up of the back side of the South ez board is going quick.

looks like a bunch of ants now working in NEZ

Quote:looks like a bunch of ants now working in NEZ
They still have a lot of work to do in the NEZ with less than 2 months to do it.  It will be a fire drill for sure.  Let's hope there are no significant rain delays.
The live stream is showing temporary work lights are on and work is progressing in the NEZ.  I think they may be working 24/7 from here on out to get it finished on time.

Just watching Jaguars.com LIVE on the website, and they had a segment on the new boards in the stadium, and the control room that will be added.  Sid Perkins, the guy who is heading up the project, was on with Brian Sexton.  Holy smokes!

 

The video board in the south end zone will have all the panels in within a week or 10 days tops.  They plan to start running tests within a month or so.  He was talking about the first test they'll do, which is an all white board test.  The engineers are saying when they do this it'll be so bright they expect to light up downtown. 

 

Along with the corner boards, they also replaced all the ribbon boards, and it's all HD, and it will all be synchronized.  Pretty cool!

 

Everything is on schedule right now.  The pools and the NEZ renovation is coming along.  The sequencing for the NEZ boards is different because of all the additional work they're doing on that end of the stadium, but everything will be done on time.

Quote:... but everything will be done on time.
 

And the check is in the mail too.
Quote:Just watching Jaguars.com LIVE on the website, and they had a segment on the new boards in the stadium, and the control room that will be added.  Sid Perkins, the guy who is heading up the project, was on with Brian Sexton.  Holy smokes!

 

The video board in the south end zone will have all the panels in within a week or 10 days tops.  They plan to start running tests within a month or so.  He was talking about the first test they'll do, which is an all white board test.  The engineers are saying when they do this it'll be so bright they expect to light up downtown. 

 

Along with the corner boards, they also replaced all the ribbon boards, and it's all HD, and it will all be synchronized.  Pretty cool!

 

Everything is on schedule right now.  The pools and the NEZ renovation is coming along.  The sequencing for the NEZ boards is different because of all the additional work they're doing on that end of the stadium, but everything will be done on time.
 

I'd like to see that
Going to be so awesome

Looks as if they were pumping concrete all night onto the north ez new deck area. Got most of the east side covered.

Quote:Looks as if they were pumping concrete all night onto the north ez new deck area. Got most of the east side covered.
 

If you go through the archived photos, it looks as if they were working through the night on it.
Quote:If you go through the archived photos, it looks as if they were working through the night on it.
 

Wouldn't surprise me.


The general contractor is a billionaire engineer. They're making deadline.
Quote:If you go through the archived photos, it looks as if they were working through the night on it.
Yeah, they definitely were. I was watching them. Ninja
Quote:Yeah, they definitely were. I was watching them. Ninja
 

It's good that you're there to watch over them.
Quote:It's good that you're there to watch over them.
 

Everyone deserves a little supervision.
Quote:It's good that you're there to watch over them.
How the hell else is it gonna get done? Every job must have a experienced web cam watching project manager. :yes:
Quote:How the hell else is it gonna get done? Every job must have a experienced web cam watching project manager. :yes:
 

You get dental and 401k with that?
From the looks of it, they're already testing the new ribbon boards.  They've got them installed in the SEZ now, and I'm assuming that will follow suit on the north side once it's completed. 